Critical Downtime & Production Loss: How to Prevent Maintenance Issues with Reliable Partners & Effective Solutions

In today’s fast-paced and sustainability-driven industrial landscape, minimizing downtime is not just a priority—it’s a necessity. For one of Laurentide’s clients in the asphalt industry, a sudden plant shutdown due to damaged instruments posed a severe threat to both their financial stability and environmental compliance. 


A Race Against Time for Their Client

When the critical instrument on the burner system failed, the consequences were immediate and severe: 

  • Complete plant shutdown for 6 hours: resulting in halted production. 
  • Daily production losses of $270,000
  • Environmental risk due to increased emissions from asphalt production. 
  • Potential penalties of $10,000 per day from government agencies. 
  • Missed project deliveries for clients.

Adding to the complexity, the delivery time for an identical replacement was an unworkable 8 weeks, leaving the client searching for better solutions. Multiple internal teams were mobilized to address the issue, but the risk of prolonged downtime continued to escalate. 

Oct 14, 2025 - Laurentide How Predictive Maintenance Can Help Prevent 6 Hours of Plant Downtime - A $270,000 Daily Production Loss 2 Critical Downtime

How Could Laurentide Help?

As the official representatives for Rosemount instruments, Laurentide takes pride in offering expertise and maintaining a well-stocked local inventory to meet their clients’ needs. Over the past year, Laurentide’s account manager has worked closely with the client, building a strong relationship through regular visits and personalized support. When faced with a challenge, the client trusted their skilled and dedicated technicians to provide reliable solutions, reinforcing the value of their partnership. 


When Efficiency Meets Expertise

Within 2 hours of the issue being flagged, the Laurentide team collaborated with their clients’ different on-site teams to deliver a seamless solution: 

  • Rapid On-Site Response: Laurentide’s technician was on-site in under 2 hours to assess, install, and test the replacement equipment. 
  • Innovative Inventory Solution: Utilizing two locally available inventory parts, Laurentide replaced the damaged unit with: 
    • Coriolis Flow Transmitter, Model 5700 Advanced (P1105798).
    • Micro-Motion 9-wire Remote Enhanced Core Processor (P1059357).
Oct 14, 2025 - Laurentide How Predictive Maintenance Can Help Prevent 6 Hours of Plant Downtime - A $270,000 Daily Production Loss 3 Critical Downtime

The immediate result was a production restart at the plant, which operates at 300 metric tons per hour, valued at $90 CAD per ton. This swift action minimized downtime and avoided what could have been catastrophic financial and environmental consequences.  


The Benefits for Their Client: Quantifiable Results

Laurentide’s intervention prevented a prolonged shutdown that could have spiraled into millions of dollars in losses for their client: 

  • $162,000 saved in lost production during the 6-hour downtime. 
  • Health and Safety Benefits: By resolving the issue quickly, Laurentide reduced prolonged exposure risks for the client’s internal teams, safeguarding their health and safety. 
  • Avoided 12 days of potential downtime, which would have cost: 
    • $3.24 million in lost production revenue. 
    • $120,000 in penalties from government and client contracts. 

Laurentide: Delivering Results When It Matters Most 

At Laurentide, they prioritize efficiency, technical expertise, and maintaining a reliable local inventory to meet their clients’ needs. When faced with a critical challenge, their rapid response and innovative solutions helped deliver results in hours. This not only created significant cost savings for their client but also strengthened their confidence in Laurentide as a trusted partner during critical moments. 


A $3.36 Million Loss Value Prevented

Had the Laurentide team not acted as quickly as they did, the total financial impact for the client would have been estimated at $3.36 million in losses. By stepping in with precision and speed, they turned a potential disaster for their client into minimized loss and a rapid plant operations restart.  

At Laurentide, they aim to empower their clients to stay competitive and resilient in the face of challenges. Predictive maintenance solutions enhance systems and assist in preventing downtime with real-time status and equipment performance updates, which enables the maintenance issues to be addressed before downtown is required.

For more information on Laurentide Solutions HERE

Oct 14, 2025 - Laurentide How Predictive Maintenance Can Help Prevent 6 Hours of Plant Downtime - A $270,000 Daily Production Loss Critical Downtime

Source

Critical Downtime Critical Downtime Critical Downtime Critical Downtime Critical Downtime Critical Downtime

Related Articles


Changing Scene

  • Laurentide Controls Chooses Bécancour for Its 6th Centre

    Laurentide Controls Chooses Bécancour for Its 6th Centre

    With more than 50 years of industrial optimization experience in Eastern Canada, Laurentide Controls is officially opening its 6th centre, located in Bécancour. The objective is clear: bring expertise closer to industrial plants, speed up interventions, and generate measurable gains in reliability, productivity and energy performance – all directly benefiting businesses in the region and,… Read More…


Sponsored Content
The Easy Way to the Industrial IoT

The way to the Industrial IoT does not have to be complicated. Whether access to valuable data is required or new, data-driven services are to be generated, Weidmuller enables its customers to go from data to value the easy way. Weidmuller’s comprehensive and cutting-edge IIoT portfolio applies to greenfield and brownfield applications. Weidmuller offers components and solutions from data acquisition, data pre-processing, data communication and data analysis.

Visit Weidmuller’s Industrial IoT Portfolio.


ADVANCED Motion Controls Takes Servo Drives to New Heights (and Depths) with FlexPro Extended Environment Product Line

Advanced Motion Controls is proud to announce the addition of six new CANopen servo drives with Extended Environment capabilities to their FlexPro line. These new drives join AMC’s existing EtherCAT Extended Environment FlexPro drives, making the FlexPro line the go-to solution for motion control applications in harsh environments.

Many motion control applications take place in conditions that are less than ideal, such as extreme temperatures, high and low pressures, shocks and vibrations, and contamination. Electronics, including servo drives, can malfunction or sustain permanent damage in these conditions.

Read More


Service Wire Co. Announces New Titles for Key Executives

Bruce Kesler and Mark Gatewood have been given new titles and responsibilities for Service Wire Co.

Bruce Kesler has assumed the role of Senior Director – Business Development. Bruce will be responsible for Service Wire’s largest strategic accounts and our growing Strategic Accounts Team.

Mark Gatewood has been promoted to the role of Vice President – Sales & Marketing. In this role, Gatewood will lead the efforts of Service Wire Company’s entire sales and marketing organization in all market verticals.

Read More


Tri-Mach Announces the Purchase of an Additional 45,000 sq ft. Facility

Tri-Mach Elmira Facility

Recently, Tri-Mach Inc. was thrilled to announce the addition of a new 45,000 sq ft. facility. Located at 285 Union St., Elmira, ON, this facility expands Tri-Mach’s capabilities, allowing them to better serve the growing needs of their customers.

Positioning for growth, this additional facility will allow Tri-Mach to continue taking on large-scale projects, enhance product performance testing, and provide equipment storage for their customers. The building will also be the new home to their Skilled Trades Centre of Excellence.

Read More


JMP Parent Company, CONVERGIX Acquires AGR Automation, Expanding Global Reach

Convergix Automation Solutions has completed the acquisition of AGR Automation (“AGR”), a UK-based provider of custom, high-performance automation design and systems integration primarily to the life sciences industry.

Following Convergix’s acquisitions of JMP Solutions in August 2021 and Classic Design in February 2022, AGR marks the third investment in Crestview’s strategy to build Convergix into a diversified automation solutions provider targeting the global $500+ billion market, with a particular focus on the $70 billion global systems integration and connectivity segments. Financial terms of the transaction were not disclosed.

Read More


Latest Articles

  • Convergix: 4 Ways Factory Automation Improves Supply Chain Management

    Convergix: 4 Ways Factory Automation Improves Supply Chain Management

    Although the disruptions caused by the Covid-19 pandemic revealed the fragility of global supply chains, factory automation has stepped up to mitigate many of those shortcomings. Since the onset of the Covid-19 pandemic, manufacturers worldwide have become acutely aware of the interconnectivity of supply chains. More recent issues such as international trade disputes and labor… Read More…

  • Panduit: A Brief Evolution of Field-Terminated Fiber Connectors

    Panduit: A Brief Evolution of Field-Terminated Fiber Connectors

    Field termination of fiber optic cable connectors is nothing new, and while there have been various products to address field termination needs over the decades, the products discussed here are: field polish, mechanical splice, and fusion splice. Each of these has had time in the spotlight, and there are commonalities that hold true across all three. Chief… Read More…